AQUACULTURE
LABORATORIES
Acualab Building Construction.
The project was executed from earthworks, civil works execution, fabrication and installation with metal structure cranes, gray work and finishing works.
- Execution time was 70 days.
PETFOOD SHED
Construction of Petfood Warehouse.
The project was executed from earthwork, civil works, fabrication and installation with metal structure cranes, casting of panels for subflooring, gray work and finished paneling and roofing.
- Lead time: 90 days.
CORPORATE
OFFICES
Construction of a Corporate Office Building.
- 750 M2 of office.
- 750 M2 of offices.
- Quality laboratories.
- Civil works from scratch.
- Execution time was 126 days.
BARN N°6
Construction of a warehouse at the Amaguaña distribution center.
From earth moving, execution of civil works, manufacture and installation with metal structure cranes, casting of panels for subfloor, gray work and finished paneling and roofing of the shed.
- Execution time was 45 days.
VOLTEER
TRUCK TURNING
Construction of Volteer Truck Turning
Earthmoving, excavation, steel forming and concrete foundries for unloading trucks with bulk product.
- Execution time was 120 days.
PRODUCTION
BUILDING
Production Building.
Manufacture and assembly of metallic structure for the subsequent assembly of production process equipment, elaboration of foundations for metallic columns.
- Execution period was 120 days.
RAW
MATERIAL SHED
Construction of metallic structures for raw material warehouses.
The project was executed from earthwork, civil works, manufacture and installation with metal structure cranes, casting of panels for subflooring, gray work and finishing, in addition to the paneling and roofing of the shed.
- Execution period was 210 days.
FINISHED
PRODUCT SHED
Construction of metallic structures for finished product warehouses.
The project was executed from earthwork, civil works, manufacture and installation with metal structure cranes, casting of panels for subflooring, gray work and finishing, in addition to the paneling and roofing of the shed.
- Execution period was 160 days.
DURAN
TRUCK TURNER
Construction of Truck Turner.
Earthmoving works, excavations, steel figuring and concrete castings for unloading trucks with bulk product.
- Execution period was 100 days.
MICROINGREDIENTS
Construction of Truck Turner.
The project was executed from the layout of the land, earthworks, civil works, fabrication and installation with metal structure cranes, gray work and finishing, in addition to the paneling and roofing of the shed.
- Execution period was 120 days.
HALL OF CALDERO
Construction of Hall of Caldero.
The project was executed from the construction of the boiler house, execution of the civil works, manufacture and assembly with cranes of columns and metal structure trusses, casting of panels for subflooring, gray work and finishing, in addition to the paneling and roofing of the house.
- Execution period was 90 days.