AQUACULTURE

LABORATORIES

Acualab Building Construction.

The project was executed from earthworks, civil works execution, fabrication and installation with metal structure cranes, gray work and finishing works.

 

  • Execution time was 70 days.

PETFOOD SHED

Construction of Petfood Warehouse.

The project was executed from earthwork, civil works, fabrication and installation with metal structure cranes, casting of panels for subflooring, gray work and finished paneling and roofing.

 

  • Lead time: 90 days.

CORPORATE

OFFICES

Construction of a Corporate Office Building.

 

  • 750 M2 of office.
  • 750 M2 of offices.
  • Quality laboratories.
  • Civil works from scratch.
  • Execution time was 126 days.

BARN N°6

Construction of a warehouse at the Amaguaña distribution center.

From earth moving, execution of civil works, manufacture and installation with metal structure cranes, casting of panels for subfloor, gray work and finished paneling and roofing of the shed.

 

  • Execution time was 45 days.

VOLTEER

TRUCK TURNING

Construction of Volteer Truck Turning

Earthmoving, excavation, steel forming and concrete foundries for unloading trucks with bulk product.

 

  • Execution time was 120 days.

PRODUCTION

BUILDING

Production Building.

Manufacture and assembly of metallic structure for the subsequent assembly of production process equipment, elaboration of foundations for metallic columns.

 

  • Execution period was 120 days.

RAW

MATERIAL SHED

Construction of metallic structures for raw material warehouses.

The project was executed from earthwork, civil works, manufacture and installation with metal structure cranes, casting of panels for subflooring, gray work and finishing, in addition to the paneling and roofing of the shed.

 

  • Execution period was 210 days.

FINISHED

PRODUCT SHED

Construction of metallic structures for finished product warehouses.

The project was executed from earthwork, civil works, manufacture and installation with metal structure cranes, casting of panels for subflooring, gray work and finishing, in addition to the paneling and roofing of the shed.

 

  • Execution period was 160 days.

    DURAN

    TRUCK TURNER

    Construction of Truck Turner.

    Earthmoving works, excavations, steel figuring and concrete castings for unloading trucks with bulk product.

     

    • Execution period was 100 days.

    MICROINGREDIENTS

    Construction of Truck Turner.

    The project was executed from the layout of the land, earthworks, civil works, fabrication and installation with metal structure cranes, gray work and finishing, in addition to the paneling and roofing of the shed.

     

    • Execution period was 120 days.

    HALL OF CALDERO

    Construction of Hall of Caldero.

    The project was executed from the construction of the boiler house, execution of the civil works, manufacture and assembly with cranes of columns and metal structure trusses, casting of panels for subflooring, gray work and finishing, in addition to the paneling and roofing of the house.

     

    • Execution period was 90 days.