INFRAESTRUCTURE

CAN LINE SHED 7,8,9

Construction of a Can Line Warehouse 7, 8, 9.

The project was executed from the sewage system, construction and assembly of sheds 7-8-9, construction and assembly of bridge rack, construction of materials shed, restitution of roof line 1, construction of repowering cistern, and fire protection system.

 

  • The execution period was 150 days.

GLASS HOPER

Construction of glass Hopper.

Sewers Cumbaya, installation works of steel pipe for main collector and metallic structure for main road. Mimetization wall for Cumbaya plant. Sewers Cumbaya, installation works of steel pipe for main collector and metallic structure for main walkway. Mimetization wall for Cumbaya plant.

 

  • Execution period: ACCORDING TO THE CONDITIONS OF EACH QUOTE.

CAMP CONSTRUCTION

Construction of camps for safety, health and environmental management in Lago Agrio and construction of covered courts in Cayambe.

From earth moving, execution of civil works, fabrication and installation with metallic structure cranes, gray work and finished paneling and roofing.

 

  • Execution period was 150 days.

CEDI

DISTRIBUTION SHED

Repowering of shed No.8 at CEDI.

From earth moving, execution of civil works, manufacture and installation of metallic structure, casting of panels for subfloor, gray work and finishing of the shed roofing.

 

  • Execution period was 60 days.

SALT SHED

Construction of sludge dehydration project, remodeling, change of floors in the runway area, construction of salt shed, bases for Vicunha tanks, including firefighting system.

 

  • Execution period was 40 days.

SALT WASHER

  • Mechanical-civil designs Construction of new salt washing machine.
  • Construction, civil-mechanical work, new salt washing machine.
  • Execution period was 120 days.

PRODUCTION SHEDS

  • Reinforcement and maintenance of the Production Shed.
  • Disassembly of roof and structure for Sheds 33 and 34.
  • Restoration of Sheds 33 and 34.
  • Repowering of Sheds 35 and 36.
  • Execution period was 120 days.

MAINTENANCE SHEDS

  • Maintenance of Sheds 8 and 9.

  • Maintenance of Sheds 10 and 11.

  • Execution period was 150 days.